System Approvals, qualifications and standards

A row of certification logos, including ICC, UL, FM Approved, SCI, and Miami-Dade
  • Miami Dade NOA 22-0907.03

  • Florida Building Code Approvals 5498, 7230, 16272, and 21581.

  • Classified for use with Roof-Ceiling Fire Resistance Designs, 1, 1-1/2, 2 and 3 hours.

  • Classified as non-combustible roof deck/roof covering substrate for use with any UL Classified A, B or C roof covering system.

  • Classified for use when UL Class 60 or UL Class 90 wind uplift resistance is required.

  • Classified for use when UL Class 90 wind uplift resistance with standing seam metal roofing is required.

  • Approved for use up to FM I-150 wind uplift resistance.

  • Complies with International Building Code.

  • Loadmaster roof deck assemblies meet the structural diaphragm design specifications of the Steel Deck Institute. Comprehensive weld studies, full-scale diaphragm tests and their evaluation were conducted by Dr. Larry Luttrell, P.E., professional consultant to the SDI and author of the Steel Deck Institute Diaphragm Design Manual.

  • All steel deck fasteners are evaluated and tested for combined uplift and shear loading.

  • Meets all International Building Code Chapter 15 and 16 requirements for roof assemblies with various roof coverings.