|
|
Professional installation
Pre-qualified, licensed, factory trained and financially
responsible contractors install Loadmaster assemblies and warrant the
quality of their work. Loadmaster's performance warranty covers both labor
and material.
 |
Step 1: Corrugated steel sections
are positioned over structural supports and anchored in place with
welded connections through special weld washers or with Loadmaster
approved mechanical fasteners. |
 |
Step 2: Thermal insulation, available
in a variety of types and thicknesses, is placed over the steel sections. |
 |
Step 3: High density tounge-and-grooved
Duraflex Mineral Board panels are placed over a thermal insulation
or directly on the steel sections. |
 |
Step 4: Specially designed, corrosion
resistant screw fasteners anchor the thermal insulation and Duraflex
Mineral Board to the steel sections, thereby developing composite
strength and stability for the roofing foundation. |
 |
Step 5: Corrosion resistant compression
discs provide concentrated load deflection continuity at all abutting
Duraflex Mineral Board locations. |
 |
Step 6: Pressure sensitive weather
resistant tape is applied over all Duraflex Mineral Board joints to
provide a continuous plane across the joints of the roof covering
foundation. With the application of joint tape, the Loadmaster Roof
Deck Assembly is complete and ready to receive the roof covering. |
For the licensed Loadmaster installers in your area,
please contact Loadmaster at (800) 527-4035.
|